Kedron Brook 20-Year Vision Sets Out Plans For A Healthier, More Resilient Waterway

Brisbane has released a draft 20-year vision to revitalise the Kedron Brook catchment, setting out a long-term direction for a healthier, more resilient waterway and a stronger lifestyle and recreation corridor.


Read: Kedron Brook tops Microplastic Count in QUT Study of Brisbane Creeks


The Kedron Brook Revitalisation Draft Vision follows an initial stage of community engagement in 2025, with the feedback received helping shape the latest proposal alongside detailed technical investigations.

The draft is now back before the community, with residents and visitors being invited to comment on how the waterway and surrounding areas could evolve over the next two decades.

Paths, Crossings, And A More Resilient Brook

Photo credit: BCC

For residents who regularly walk, run or cycle beside the Brook, the draft includes several proposed changes to the pathway network. Kedron Brook has about 20km of pathways used by more than 600,000 cyclists and pedestrians each year. The vision proposes upgrades and widening to improve walking, running and cycling connections through the catchment.

Flood-prone sections of bikeway are proposed to be relocated, while safer crossings, more resilient bridges and flood-resilient lighting are among the measures identified for the corridor. The proposals extend beyond paths and transport links. At Grinstead Park, concrete drains are proposed to be replaced with natural waterways, while opportunities have been identified to widen waterway pinch points along Kedron Brook.

The draft also identifies opportunities to strengthen wildlife habitat, improve water quality and restore natural systems, alongside measures aimed at improving the catchment’s resilience to flooding. More shade, seating, drinking fountains, lookouts and additional trees are also included in the vision.

Photo credit: BCC

Cr Adrian Schrinner said the proposal was intended to make Kedron Brook an even stronger nature-based destination.

“Our vision is for Kedron Brook to become an even better nature-based destination, with well-lit paths, safer crossings and more resilient bridges, more shade, seating and drinking fountains, new lookouts, and more trees to help create cooler, leafier neighbourhoods. 

“While we cannot prevent flooding, we can plan for it. This draft vision will improve flood resilience, restore the natural function of the Brook where possible and protect the natural environment that makes it so special.”

The draft vision describes Kedron Brook as a place where people can walk, ride, play sport, connect with nature and enjoy their local community, while planning for a more flood-resilient landscape.

The proposed measures cover movement and recreation along the waterway, as well as environmental restoration and flood resilience. Any changes would form part of a long-term approach rather than a single construction project.

Community Feedback

Photo credit: BCC

Community members provided feedback on the draft vision through an online survey or by attending one of nine information kiosks being held at locations throughout the catchment.

A community feedback session was held at Hickey Park in Stafford on Saturday, August 15, from 9am to 11am. Other sessions are scheduled at Teralba Park, Kalinga Park, Dash Street Park, Shaw Estate Park and Grinstead Park throughout August and early September.


Read: Stafford’s Next Chapter: A Suburban Shift Along Kedron Brook


The consultation page states that community input will help shape the final Vision. The draft vision and consultation details can be viewed through Brisbane’s Kedron Brook Revitalisation consultation page.

Updated 28-September-2026

Have Your Say on the 20-Year Kedron Brook Vision and Master Plan 

Local residents are being invited to help shape a long-term vision for one of the city’s most well-loved natural spaces, with community consultation now open on a major plan to revitalise the Kedron Brook catchment.


Read: Kedron Brook Set for Major Transformation in Olympic Lead-up


Stretching 29 kilometres from Ferny Grove to Nudgee, Kedron Brook winds through 14 suburbs and serves as both a natural waterway and a vital green corridor. Whether it’s a place for morning walks, bike rides, or spotting native wildlife, for many locals the brook is part of daily life—and now, they have a chance to help decide its future.

Kedron Brook Vision

Kedron Brook catchment (Photo credit: BCC)

The Kedron Brook Revitalisation Vision and Master Plan is a 20-year, $85 million proposal that aims to protect and improve the catchment while making it more accessible, enjoyable and resilient for generations to come.

Key goals of the project include:

  • Developing a long-term vision and master plan for the entire catchment
  • Revitalising creekside areas with new planting and improved water flow
  • Strengthening the flood resilience of the waterway
  • Creating more spaces for recreation and relaxation

Four precincts along the brook will be identified for targeted upgrades, and the plan is being shaped in stages, with multiple opportunities for the community and key stakeholders to provide input.

kedron brook
Photo credit: Robert Goh/Google Maps

The current phase—running from April to June 2025—focuses on gathering ideas and feedback from the public. This will inform a draft master plan, to be released for further consultation from mid-2025 to early 2026. The final vision and plan are expected to be completed in the second half of 2026.

While major projects like this often draw attention for their scale, what sets this one apart is the emphasis on everyday voices. Residents, community groups, and local users of the brook are being placed at the heart of the planning process.


Read: Cyclone Alfred Aftermath: North Brisbane Underwater as Kedron Brook Swells


How to Have Your Say

There are two easy ways to get involved and share your thoughts:

Online
Visit the Council’s “Kedron Brook Revitalisation” project page to:

  • Add location-specific comments on an interactive map
  • Share your aspirations for the catchment
  • Complete a short survey

Online feedback closes at 11.59pm on Sunday, 29 June 2025.

In Person
Pop by one of the local information kiosks to speak with the project team:

  • Thursday 1 May, 3–5pm — Dash Street Park, Keperra
  • Saturday 10 May, 8–10am — Grinstead Park, Alderley
  • Wednesday 14 May, 3–5pm — Shaw Estate Park, Wavell Heights
  • Thursday 15 May, 3–5pm — Teralba Park, Everton Park
  • Saturday 17 May, 8–10am — Kalinga Park, Clayfield
  • Saturday 24 May, 8–10am — Hickey Park, Stafford
  • Sunday 25 May, 9am–3pm — Sustainable BNE Festival, Roma Street Parkland, Brisbane City

Whether you walk it daily or simply love Brisbane’s natural spaces, this is your opportunity to help shape what Kedron Brook will look like in 2045 and beyond.

Published 21-April-2025